[2006 - WATPAC]
WHITE WATER WORLD - DREAMWORLD
  • Job: White Water World (Dreamworld)
  • Client: Watpac
  • Tonnage: 200t
  • Date Commenced: August 2006
  • Duration Of Scope: 3 Months
  • Specification:
  • Welding AS1554.1SP
  • Fabrication AS4100
  • Protective Coating: Hot Dip Galvanized, Blasted & Painting, 2 coat system 200 microns.
Description:

Dreamworld one of Australia’s biggest and best theme parks created a water park next door, Watpac contracted ATW Group to do all Fabrication, installation and erection of structural steel, stairways, towers, decks, cone frame for a large ride with a radius of 20mtrs and fiberglass slides. Our equipment came in handy with the reach and lift of the 50t liebherr along with all our boom, scissor lifts and the telehandler to help complete this project in record time.