[2012 - BAULDERSTONE]
PORT OF BRISBANE CONTAINER TERMINAL
  • Job: Port of Brisbane Container Terminal [2012 – Baulderstone]
  • Client: Baulderstone
  • Tonnage: 220t
  • Date Commenced: May 2012
  • Duration Of Scope: 6 months
  • Specification:
  • Welding: AS1554.1 SP
  • Fabrication: AS4100
  • Protective Coating: Hot Dip Galvanised
Description:

ATW Group are working with Baulderstone on Brisbane’s newest Container Terminal – Berth 11. Which is programmed to be in operation by the end of 2012.

Our scope includes approximately 220t of structural steel; container inspection frames, reefer gantries and substations etc. All of which are critical to the creation of dynamic container port operations.