[2008 - HUTCHINSON BUILDERS]
CEMENT AUSTRALIA SILO
  • Job: 20,000t Cement Silo (Cement Australia)
  • Client: Hutchinson Builders.
  • Tonnage: 80t
  • Date Commenced: March 2008
  • Duration Of Scope: 4 Months
  • Specification:
  • Welding AS1554.1SP
  • Fabrication AS4100
  • Protective Coating: Blasted & Painted to inorganic zinc 75 microns.
Description:

To Supply, Fabricate, Sand Blast, Paint and erect Structural steel as per clients specifications. The project consists of two large 24 meter beams, weighing 16t each. These beams were fabricated from nothing in our workshop, once onsite they were lifted 80meters high and secured into place by a 200 and 150t crawler crane. A large inner cone to displace cement sand weighing 12t. bondek spanning the entire roof Specialist welding and fabrication to design and fabricate this inner cone was necessary. All cranes supplied due to scale of project.